Sign In | Join Free | My hardware-wholesale.com |
|
Brand Name : HANYUN
Model Number : HY120
Place of Origin : China
MOQ : 1 set
Price : Negotiable price
Payment Terms : L/C, T/T
Supply Ability : 10,000 sets per year
Delivery Time : 3-15working days
Packaging Details : plywood box or other exported packages
Item : Hydraulic Jack Hammer
Chisels materials : 42crmo
Breaker chisels diameter : 120 mm
Breaker shell materials : High strength steel plate
Working Purpose : Building demolition and concrete breaking
Applicable backhoe and skid steers : world-famous brand
Applicable skid steers : 12-18 Ton
Color : Blue or customized colors
Hydraulic Jack Hammer Skid Steer Loaders Mounted Hydraulic Piling Hammers
(1) About Hydraulic Jack Hammer Skid Steer Loaders Mounted Hydraulic Piling Hammers
By customized hammer chisels, the hydraulic jack hammer could also realize to strike piles as one piling machine
(2) Main Technical Parameters on hydraulic jack hammer
Hydraulic Hammer Model | HY85 | HY120 |
Breaker shell weight (KGS) | 400 | 500 |
Total weight(KG) | 493 | 1374 |
Size (MM) | 1270*370*800 | 1475*530*1000 |
Driving oil pressure (KG/CM2) | 130-160 | 150-170 |
Hydraulic oil flow (L/MIN) | 60-100 | 90-120 |
Striking frequency (BPM) | 400-800 | 350-650 |
Soft hose diameter (INCH) | 3/4 | 3/4 |
Drill rod diameter (MM) | 85 | 120 |
Drill rod weight (KG) | 48 | 120 |
Applicable carrier weight (T) | 7-14 | 12-18 |
(3) About packing and transportation
1. About packing: Usually the hydraulic jack hammer is packed with plastic film firstly, then packed them
with plywood box or plywood pallets before loading them into container
2. About transportation: the popular transportation method is by sea, by air, by railway and by road
(4) How about the after-sale service?
The after-sale service starts with the order immediately.
1. After order is confirmed, production of hydraulic jack hammers will be started immediately;
2. In the production, we will monitor every steps and keep update production details;
3. After production, test running must be done to ensure normal working of machines in the worksite;
4. In the shipping, shipping details will be tracked and updated;
5. As the hydraulic hammer reaches the worksite, we will guide you to install and debugging;
6. For any troubles in the working, we will help solve the problems asap.
![]() |
18 Ton Skid Steer Loader Hammer 42crmo Chisels Jack Piling Breaker Images |